Construction method of prefabricated multi-ribbed cavity floor
A technology of cavity floor slab and construction method, which is applied in the direction of floor slab, structural elements, building components, etc., can solve the problems of waste of resources, loose and firm formwork support and seepage of concrete slurry, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment
[0039]Refer to the attachmentfigure 1 As shown, the present invention provides a technical solution: a prefabricated rib cavity floor construction method, including the following steps:
[0040]S1, full hall scaffolding: When a full view is 10, it is required to align the vertical rod 11 alignment, and the vertical rod 11 is arranged from the two sides of the current ribs 20, and set up in the intersection of the floor bomb bidder. The rod 11, the vertical rod 11 is placed on the foot plate 12.
[0041]Specifically, when the full hall scaffold 10 is built, the vertical rod 11 must not be placed directly on the floor; and the length of the footboard 12 should be greater than or equal to 300 mm to make the vertical rod 11 loaded a uniform distribution of the floor panel surface, transfer to the lower layer. On the floor.
[0042]S2, laying the main ribs: When the main ribs 30 are installed, the main ribs 30 are required to be neat, not skew, and the two vertical rods 11 and the main keel 30 mu...
PUM

Abstract
Description
Claims
Application Information

- Generate Ideas
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com