Construction method of prefabricated multi-ribbed cavity floor
A technology of cavity floor slab and construction method, which is applied in the direction of floor slab, structural elements, building components, etc., can solve the problems of waste of resources, loose and firm formwork support and seepage of concrete slurry, etc.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2021-05-07
- Estimated Expiration
- Not applicable · inactive patent
Abstract
Description
Technical field
[0001] The present invention belongs to the prefabricated ribbed construction technology, in particular, to a prefabricated rib cavity floor construction method.Background technique
[0002] In order to improve labor productivity, reduce resource energy consumption, improve architectural quality and improve the quality of human residence, and the proportion of construction industries has increased year by year. The prefabricated macrostic cavity floor is a prefabricated component of the prefabricated cavity floor system, which solves the defects such as current-in-place concrete, and to generate shrinkage cracks, improve the changes and flexibility of building space. Sex.
[0003] However, in the existing construction method, more dependence on the template, wood, etc., usually, to the sporadic cutting of the template, wood, etc., and template The shackles are closed, strong, and the concrete slurry is oozed from the preform ribs when the pouring.Inventive content
[0004] The emb...
Examples
Embodiment
[0039]Refer to the attachmentfigure 1 As shown, the present invention provides a technical solution: a prefabricated rib cavity floor construction method, including the following steps:
[0040]S1, full hall scaffolding: When a full view is 10, it is required to align the vertical rod 11 alignment, and the vertical rod 11 is arranged from the two sides of the current ribs 20, and set up in the intersection of the floor bomb bidder. The rod 11, the vertical rod 11 is placed on the foot plate 12.
[0041]Specifically, when the full hall scaffold 10 is built, the vertical rod 11 must not be placed directly on the floor; and the length of the footboard 12 should be greater than or equal to 300 mm to make the vertical rod 11 loaded a uniform distribution of the floor panel surface, transfer to the lower layer. On the floor.
[0042]S2, laying the main ribs: When the main ribs 30 are installed, the main ribs 30 are required to be neat, not skew, and the two vertical rods 11 and the main keel 30 mu...